Preparing Your Garage Before the Installer Arrives

Preparing Your Garage Before the Installer Arrives

A little prep on your side saves time on install day. Here's the short list.

Clear the Floor Completely

  • Move vehicles out
  • Move tool chests, workbenches, freezers, storage shelves
  • Empty the floor of anything you can carry

You Don't Need to Deep Clean

Skip the pressure wash and the acid etch. We're grinding the slab mechanically — the surface will be ground into fresh concrete regardless of what's on top.

Point Out Known Issues

Show us any active leaks, spots where you've had moisture in the past, hot-tire spots on old coating, or cracks you're aware of. Two minutes of context helps the install.

Plan for the Cure Window

Confirm how long you need to be off the floor. Typical: 24 hours foot traffic, 72 hours vehicle traffic. Polyaspartic systems shorten both.

More on Preparing Your Garage Before the Installer Arrives

Prep Questions