Spring (Mar–May)
Mild temps and moderate humidity make spring one of the easiest install windows. Book early — spring calendars fill fast with homeowner projects.
Summer (Jun–Aug)
Warm slabs cure faster, which is a benefit — but afternoon humidity and pop-up storms shift scheduling. We start early and adjust topcoat chemistry for the conditions.
Fall (Sep–Nov)
Often the best window: dry air, stable temps, and predictable cure. Fall installs are ideal for polyaspartic 1-day systems.
Winter (Dec–Feb)
Interior garages install fine with heated space or cold-tolerant formulations. Uninsulated slabs below ~50°F need extra planning; we may reschedule a cold snap.