Two quick tests before install decide whether your slab needs a moisture-mitigating primer — or fails a coating six months later.

RH Probe (ASTM F2170)

A probe measures relative humidity inside the slab at 40% depth. It's the gold standard test and correlates well with long-term vapor performance.

Calcium Chloride (ASTM F1869)

A dish of anhydrous calcium chloride sits sealed on the slab for 60-72 hours. The weight gain calculates moisture vapor emission rate (MVER) in lbs/1000 sq ft/24 hrs.

What the Numbers Mean

  • RH under 75% — standard primers work
  • RH 75-85% — moisture-mitigating primer required
  • RH over 85% — heavy-duty MMP system required
  • MVER under 3 lbs — standard install
  • MVER over 3-5 lbs — MMP required per system spec

When We Test

Basements, older slabs, ground-floor commercial, and any project where the client reports past moisture symptoms. We include testing in the quote when relevant.