Week 1: Site Assessment
Walkthrough, moisture testing, existing coating evaluation, and system recommendation. We map out zones so operations can continue.
Week 2-3: Proposal & Scheduling
Detailed scope, system spec sheets, and a phased schedule. We coordinate around your production, shipping, or service calendar.
Install Days: Zone-by-Zone
- Day 1: Prep and prime one zone
- Day 2: Basecoat and broadcast
- Day 3: Topcoat and cure
- Day 4: Return to service; move to next zone
After the Last Zone
Full-facility walkthrough, line striping verification, warranty registration, and a maintenance guide handed off to your facilities team.